Steel Space Frame
OUR PRODUCTS
Comprehensive Turnkey Engineering Services
Project Consultation
3D Design & Modeling
Smart Manufacturing
Global Installation
Related question answers
Industry News & Insights
How long for steel structure workshop design and construction?
Design: 7–15 working days. Total construction: 30–90 days, based on area and complexity.
Do you provide steel structure EPC general contracting?
Yes, we offer one-stop EPC services including design, production, transportation and installation.
Can steel structure buildings be customized in size and function?
Yes, fully customizable in size, layout, bearing capacity and functions.
Can flat-pack container houses be customized in size and interior?
Yes, we customize dimensions, layout, wiring and interior decoration.
What are the material and insulation of flat-pack containers?
Made of high-strength steel and rock wool/polyurethane panels, with good heat and sound insulation.
What types of mechanical parking systems are available?
Lifting-traversing, vertical lifting, simple lifting and other intelligent parking solutions.
Do parking garages support fully automatic operation?
Yes, our intelligent garages support fully automatic parking and retrieval.
What specifications and materials for anchor bolts?
Various standard/custom sizes; materials include Q235B, Q355B and high-strength steel.
Do you provide bolt processing and installation?
Yes, we offer custom bolt processing and on-site installation support.
What after-sales services are provided?
Project guidance, maintenance, structural inspection, repair and long-term technical support.

